Skip to content
HNYZ Group logo
Exhaust Air Odor Treatment for a pig farm

Climate Control · G10

Exhaust Air Odor Treatment

Scrubbers and filters that reduce the smell and dust in the air leaving the pig house.

  • Reduces odor and dust in exhaust air
  • For sites near neighbours or under local rules
  • Type chosen by air volume and target

Sizes and configuration are customised to the project; details are agreed with you before quotation.

Overview

Air from the pig house carries odor and dust. A treatment unit such as a wet scrubber or a biological filter takes some of these out before the air is released. It is added where neighbours or local rules require it. The type and size depend on the air volume and the target.

Features

  1. 01

    Reduces odor and dust

    Treats air before it leaves the house.

  2. 02

    For neighbours and rules

    Added where required.

  3. 03

    Several types

    Scrubber or biological filter.

Specifications

Typical reference values. Final dimensions, materials and configuration are customised to your project and confirmed with you before quotation.

Exhaust Air Odor Treatment: Specifications
CharacteristicDescription
TypesWet scrubber or biological filter
AirflowSet by the house exhaust
Water and chemicalsUsed by scrubbers; set by the design
SpaceOutside the house
EfficiencyDepends on design; no figure is quoted here
CustomisationYes. Sizes, materials and configuration are adapted to the project.
InstallationSupported by HNYZ installation teams; scope agreed per project.
Packing and transportPacked for sea or road shipping; method agreed per order.
WarrantyAgreed per project.
CertificatesPlease ask for the documents required in your market.

Where it is used

  • Farms near neighbours
  • Farms under emission rules
  • Large houses

Why HNYZ Group

One company for planning, supply and installation, so the equipment fits the rest of the farm.

50
Installation teams
3,000
Completed projects
50+
Countries served

Service

Pre-sales

  • Requirement analysis
  • Layout and equipment list
  • Quotation agreed in detail

Installation

  • Installation by HNYZ installation teams
  • Commissioning and testing
  • Staff training

After-sales

  • Spare parts list with the order
  • Technical support
  • Support for expansion

Frequently asked questions

How much odor does it remove?

It depends on the design and the air. We discuss targets with you.

Is it costly to run?

Water, power and chemicals are the main costs.

How are the fans sized?

From the house volume, pig number and peak outside temperature. We calculate the airflow and propose the fan count.

Do I need cooling pads?

In hot climates, pads cool incoming air by evaporation and are common. In cold climates, heating matters more.

Can alarms be added?

Yes. Controllers can sound an alarm when temperature goes out of range, and monitoring can be added.

What happens in a power cut?

Houses need a plan for power cuts: alarms, a generator, or emergency openings. We discuss options with you.

How much does ventilation cost to run?

Fan power is a major part of running cost. Variable-speed fans and good design can lower it.

Are sizes and configurations fixed?

No. Dimensions, materials and configuration are customised to your herd size, climate and local rules, and agreed with you before quotation.

Are the specifications on your product pages final?

They are typical reference values to help you compare. Final specifications are confirmed with you before quotation.

Who installs the equipment?

Our installation teams install and commission the equipment. The scope for each project is agreed in the contract.

What warranty do you give?

Warranty terms depend on the equipment and are agreed per project in the contract.

All frequently asked questions →

Enquiry

Ask about this product

Send us your herd size, site and timeline. We reply with a recommended configuration and a quotation.

What happens next

  1. 1

    You send your project details

    Herd size, site, land and target start date. Rough numbers are enough.

  2. 2

    We reply with a layout and an equipment list

    Our team reviews your requirements and proposes a configuration.

  3. 3

    We agree the details with you

    Sizes, materials and scope are confirmed before any quotation.

50
Installation teams
3,000
Completed projects
50+
Countries served
  • Email: sales@hnyzgroup.com
  • +86 185 3894 3078
  • Jiaozuo City, Henan Province, China
  • Founded in 2005 · 300 employees
  • Factory visits welcome: contact us to arrange

Send your inquiry

Your details are used only to answer your inquiry — see our Privacy Policy.

More in Climate Control

Request a Quote